ICI News:

Independence Constructors was Awarded an extension of the "New Jersey State Contract for Fuel Storage Tank Services". This extension will continue to allow ICI to perform services requested by any State, Township or Municipal Agency until August 28th, 2019. Click here to view the Contract (with Extension).
(Requires AdobeTM Reader)

ICI Succeeds:

DEF System Installation

PILOT Travel Center
Bloomsbury, New Jersey:


In July of 2011, ICI was selected to install a new Diesel Exhaust Fluid (DEF) System installation. This project included installation of a new 8,000 gallon double walled fiberglass underground storage tank (UST), piping, dispensers, and leak detection. ICI completed the project in November of 2011 and the site was one of the first PILOT Travel Centers in the State to offer DEF from the pumps. ICI has since been awarded a second PILOT travel Center DEF installation in Mahwah, NJ. This project is scheduled for the early Spring.

 

Heating Oil UST System Project

Veterans Hospital
Lyons, New Jersey:


In August of 2009, ICI was contracted to perform the Heating Oil UST upgrade. This project consisted of removal of the existing (4) 30,000 gallon and (1) 20,000 gallon USTs and the installation of (4) new double walled 40,000 gallon and (1) 10,000 gallon USTs. After a series of redesigns, the project began in June of 2010, and quickly became the largest tank project in the history of ICI. By November, the tanks and piping were installed, the area had been resurfaced, and the system was back online for the Winter.

 

Truck Fuel System Upgrade

United States Postal Facility
Jersey City, New Jersey:


In May of 2011, ICI was awarded the Fuel System Upgrade project at the USPS. This project included the removal of a canopy, (2) 10,000 gallon USTs, the fueling island, as well as the installation of (1) 12,000 gallon Aboveground Storage Tank (AST), new dispensers, new island, and canopy. With a very high water table and soft ground, 60 deep piles had to be installed to support the new AST and canopy footers. From June through September, ICI worked hand in hand with the USPS and consultants to complete the installation of the new truck fueling system.